Watch Our New Home Take Shape

We’re thrilled to share a behind-the-scenes look at the construction of our new space with photos and timelapse videos.


Update for September, 2026: Things are REALLY coming together at our new building on Maple Street. With our new building we have decided to give it the more appropriate street address of 1770 Maple Street and the site will become Elings Square. With just a month or two before completion things are getting exciting with preparation for moving into our new HOME.

The most recent work has been getting the parking lot pavers installed. It has been a chore to get the proper grade level of the parking lot just right so that there is proper drainage and a good solid surface for the paver bricks in the parking lot

Inside things are coming along nicely. The flooring has been installed and the movable room divider “walls” have been put in place so that we can have several activities separated out on the main floor. We are still waiting for the electricity to be hooked up to the main power panel so that we can get off our temporary power source and hook up all the lighting and equipment inside the building.

The construction camera has been discontinued since we have removed the temporary construction office that the camera was mounted on. From now on we will be giving photo updates of the new building instead of the time lapse videos.

There are many more hours of work to go until things are finally ready for us to open the doors to you all, but we can guarantee it will be some time soon in the coming months, right now we can really see some pretty amazing things happening!


     September,  2026   

Take a look Inside!

With the flooring in place things are looking amazing. The moveable room dividers walls are in place and you can start to see how we will have the ability to create different spaces for all our activities. Our new modern kitchen has all of its appliances in place and the upstairs library is awaiting some new books and reading materials.

The view from above the activities spaces
Inside the upstairs library

Take a look outside!

The patio pavers are mostly completed for the outside spaces. The bocce ball court is in place and we are excited to offer that activity to members after we open. The pavers in our parking lot are now in place and we are ready to have the lines added to mark off the parking spaces.

The main dining and events area
The brand new kitchen
One of the main activity areas with the movable walls in place


June 2026 

Stucco siding Completed!

Our final Time lapse video from our Construction camera showing the installation of the stucco.

For an archive of past time lapse videos go to our Construction ARCHIVE page